• Economy & Labor
  • Home
  • Projects
  • Safety
  • Sample Page
Thursday, May 14, 2026
  • Login
No Result
View All Result
NEWSLETTER
Construction News - TradesBuilt
No Result
View All Result
Construction News - TradesBuilt
No Result
View All Result
Home Projects

Sacramento’s Advanced Orthopedics and Sports Medicine Care Complex Contract Awarded

by Justin @TradesBuilt
14 May 2026
in Projects
0
Sacramento's Advanced Orthopedics and Sports Medicine Care Complex Contract Awarded
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter


Tutor Perini Corporation, a leading civil, building and specialty construction company, announced that its subsidiary, Rudolph and Sletten, has been awarded a contract by Sutter Health for its future Advanced Orthopedics & Sports Medicine Care Complex in Sacramento, California.

The project scope of work includes the conversion of the existing 660 J Street office building into a new approximately 120,000 square-foot ambulatory surgical center and medical office building to help meet growing demand for Sutter’s advanced orthopedics and sports medicine capabilities.

Significance of the New Facility

The new facility will help enhance access for patients through expanded medical offices and exam rooms, concussion clinics, a performance lab, physical therapy, and spaces for research, as well as five operating rooms, sterile processing and advanced imaging areas. The project will include significant structural upgrades to the existing cast-in-place post-tensioned structure to meet current seismic requirements. All new mechanical, electrical and plumbing systems will replace the existing building systems. Also, this project alongside others such as the South West Healthcare Inland Valley Hospital are expected to boost healthcare services in California.

Pre-construction work on this project commenced in the spring of 2025 and the project recently entered the construction phase with substantial completion anticipated in the fall of 2027. The undisclosed contract value was reflected in the Company’s backlog at the end of the first quarter of 2026.

Pre-construction work on this project commenced in the spring of 2025.
Pre-construction work on this project commenced in the spring of 2025.

Sacramento’s Advanced Orthopedics and Sports Medicine Care Complex Project Factsheet

Location: 660 J Street, Sacramento, California.

Total Area: Approximately 120,000 square feet.

Project Type: Office-to-medical conversion (adaptive reuse).

Primary Contractor: Rudolph and Sletten (a subsidiary of Tutor Perini Corporation).

Target Completion: Fall 2027 (Substantial completion).

Clinical Scope and Facilities

  • Surgical Center: Features five state-of-the-art operating rooms and dedicated sterile processing areas.
  • Diagnostic Imaging: Advanced imaging suites for rapid and precise diagnostics.

Performance and Recovery:

  • Performance lab for athletic assessment.
  • Comprehensive physical therapy and rehabilitation wing.
  • Specialized concussion clinics.
  • Consultation and Research: Expanded medical offices, exam rooms, and dedicated spaces for musculoskeletal research.

Construction and Engineering Highlights

  • Structural Upgrades: The project involves significant structural reinforcement of the existing cast-in-place, post-tensioned building to meet current California seismic safety requirements.
  • System Modernization: A complete overhaul of the building’s infrastructure, including all-new mechanical, electrical, and plumbing (MEP) systems.

Timeline:

  • Spring 2025: Pre-construction phase commenced.
  • May 2026: Project transitioned into active construction.
Tags: Construction NewsProjectsUpcoming Construction Projects
Justin @TradesBuilt

Justin @TradesBuilt

Next Post
HS2 Curzon 2 Bridge Assembly Complete as Engineers Prepare 180-Metre Launch Over Birmingham Railway

HS2 Curzon 2 Bridge Assembly Complete as Engineers Prepare 180-Metre Launch Over Birmingham Railway

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • $1bn+ Spurs Downtown Arena in San Antonio, Texas Advances as Owners Select 9 Firms
  • HS2 Curzon 2 Bridge Assembly Complete as Engineers Prepare 180-Metre Launch Over Birmingham Railway
  • Sacramento’s Advanced Orthopedics and Sports Medicine Care Complex Contract Awarded
  • Pearson LIFT Program Breaks Ground on CA$3 Bn Overhaul at Toronto Pearson International Airport
  • SH 99 Grand Parkway Segment B-1 Awarded to Ferrovial in $1.47 Billion Southeast Houston Tollway Deal

Recent Comments

No comments to show.

Archives

  • May 2026
  • April 2026
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023

Categories

  • Economy & Labor
  • News
  • Projects
  • Safety
  • Economy & Labor
  • Home
  • Projects
  • Safety
  • Sample Page

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Economy & Labor
  • Home
  • Projects
  • Safety
  • Sample Page

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.